learn.howToCalculate

learn.whatIsHeading

Measures the rate at which a process produces output (units per hour/day). Indicates production efficiency and constraint locations.

Guía paso a paso

  1. 1Record units completed in time period
  2. 2Account for downtime and changeovers
  3. 3Divide total units by total time available
  4. 4Track over time and by shift
  5. 5Identify bottlenecks

Ejemplos resueltos

Entrada
100 parts/8hrs
Resultado
12.5 parts/hr

Errores comunes a evitar

  • Not accounting for quality in throughput (counting defects)
  • Ignoring equipment downtime impact

Preguntas frecuentes

What's good throughput?

Varies by process; track trends to ensure improvement; 5-10% annual gains typical with optimization.

How do I increase throughput?

Remove bottlenecks, improve equipment, better scheduling, reduce waste, and improve worker training.