Tracks work in progress using visual columns (to-do, in-progress, done). Limits WIP to improve flow and reduce cycle time.

चरण-दर-चरण मार्गदर्शिका

  1. 1Set maximum WIP limit per column
  2. 2Move cards as work progresses
  3. 3Pull work from backlog when capacity available
  4. 4Identify bottlenecks where WIP exceeds limit
  5. 5Continuously improve based on metrics

हल किए गए उदाहरण

इनपुट
30 items, 10/col
परिणाम
WIP limited

सामान्य गलतियां जिनसे बचना है

  • Setting WIP limits too high defeating purpose
  • Not refreshing backlog priority regularly

अक्सर पूछे जाने वाले प्रश्न

What WIP limit should I use?

Start with team size × 2-3; adjust lower if blocking frequently, higher if flowing well.

How does Kanban improve productivity?

Limits multitasking, reduces context switching, clarifies priorities, enables faster cycle times.