Cara Menghitung Kanban Board

learn.whatIsHeading

Tracks work in progress using visual columns (to-do, in-progress, done). Limits WIP to improve flow and reduce cycle time.

Panduan Langkah demi Langkah

  1. 1Set maximum WIP limit per column
  2. 2Move cards as work progresses
  3. 3Pull work from backlog when capacity available
  4. 4Identify bottlenecks where WIP exceeds limit
  5. 5Continuously improve based on metrics

Contoh Terpecahkan

Masukan
30 items, 10/col
Hasil
WIP limited

Kesalahan Umum yang Harus Dihindari

  • Setting WIP limits too high defeating purpose
  • Not refreshing backlog priority regularly

Pertanyaan yang sering diajukan

What WIP limit should I use?

Start with team size × 2-3; adjust lower if blocking frequently, higher if flowing well.

How does Kanban improve productivity?

Limits multitasking, reduces context switching, clarifies priorities, enables faster cycle times.

Siap menghitung? Coba Kalkulator Kanban Board gratis

Cobalah sendiri →