Cooling Load Calculator helps contractors and tradespeople accurately size, spec, and estimate materials and systems.

ସୂତ୍ର

Cooling Load = Solar Gain + Internal Heat + Infiltration + Transmission

ଷ୍ଟେପ୍-ଷ୍ଟେପ୍ ଗାଇଡ୍ |

  1. 1Sum all heat sources: solar, people, equipment, infiltration, walls
  2. 2Apply the formula using your project measurements
  3. 3Add required safety factors or waste allowances per code

ସମାଧାନ ହୋଇଥିବା ଉଦାହରଣ

ଇନପୁଟ୍
4000 BTU solar + 2000 people + 1500 equipment + 2500 transmission
ଫଳ
Total Cooling Load = 10,000 BTU/hr

ଏଡ଼ାଇବା ଯୋଗ୍ୟ ସାଧାରଣ ଭୁଲ

  • Not applying code-required safety factors or derating
  • Forgetting to account for waste and cut losses in material estimates