Measures the rate at which a process produces output (units per hour/day). Indicates production efficiency and constraint locations.

ଷ୍ଟେପ୍-ଷ୍ଟେପ୍ ଗାଇଡ୍ |

  1. 1Record units completed in time period
  2. 2Account for downtime and changeovers
  3. 3Divide total units by total time available
  4. 4Track over time and by shift
  5. 5Identify bottlenecks

ସମାଧାନ ହୋଇଥିବା ଉଦାହରଣ

ଇନପୁଟ୍
100 parts/8hrs
ଫଳ
12.5 parts/hr

ଏଡ଼ାଇବା ଯୋଗ୍ୟ ସାଧାରଣ ଭୁଲ

  • Not accounting for quality in throughput (counting defects)
  • Ignoring equipment downtime impact

ବାରମ୍ବାର ଜିଜ୍ଞାସା

What's good throughput?

Varies by process; track trends to ensure improvement; 5-10% annual gains typical with optimization.

How do I increase throughput?

Remove bottlenecks, improve equipment, better scheduling, reduce waste, and improve worker training.