Skip to main content

learn.howToCalculate

learn.whatIsHeading

Concrete is made of cement, sand, gravel, and water. Calculating the volume before ordering or mixing prevents expensive over-ordering or frustrating shortages. Volume is always measured in cubic feet or cubic yards.

Guia passo a passo

  1. 1Measure length, width, and depth of the pour in feet
  2. 2Volume (cubic feet) = length × width × depth
  3. 3Cubic yards = cubic feet ÷ 27
  4. 4Add 5–10% waste factor for form overruns and spillage

Exemplos resolvidos

Entrada
20×15 ft slab, 4 in (0.33 ft) deep
Resultado
3.33 yd³ + 10% = 3.67 yd³
20×15×0.33=99 ft³÷27=3.67
Entrada
Footing: 40×1×2 ft
Resultado
2.96 yd³
80 ft³÷27

Configurações

PrivacidadeTermosSobre© 2026 PrimeCalcPro