Skip to main content

learn.howToCalculate

learn.whatIsHeading

Determines inverter capacity to handle peak loads from solar or battery systems. Prevents inadequate power and equipment damage.

Пошаговое руководство

  1. 1Sum peak simultaneous power consumption (watts)
  2. 2Account for inrush current (motors 3-5× running)
  3. 3Add 25-50% capacity headroom for growth
  4. 4Select inverter rated 120-150% of peak load

Решённые примеры

Ввод
2000W peak load
Результат
3000W inverter

Распространённые ошибки

  • Using average power instead of peak power
  • Not accounting for motor inrush current

Часто задаваемые вопросы

What happens if inverter is undersized?

Insufficient power for peak loads, brownouts, equipment damage, and automatic shutoff.

What if inverter is oversized?

Wastes money; minor efficiency loss; better to slightly oversize than undersized.

Готовы посчитать? Попробуйте бесплатный калькулятор Inverter Sizing

Попробуйте сами →

Настройки