learn.whatIsHeading

Tracks work in progress using visual columns (to-do, in-progress, done). Limits WIP to improve flow and reduce cycle time.

Steg-för-steg-guide

  1. 1Set maximum WIP limit per column
  2. 2Move cards as work progresses
  3. 3Pull work from backlog when capacity available
  4. 4Identify bottlenecks where WIP exceeds limit
  5. 5Continuously improve based on metrics

Lösta exempel

Ingång
30 items, 10/col
Resultat
WIP limited

Vanliga misstag att undvika

  • Setting WIP limits too high defeating purpose
  • Not refreshing backlog priority regularly

Vanliga frågor

What WIP limit should I use?

Start with team size × 2-3; adjust lower if blocking frequently, higher if flowing well.

How does Kanban improve productivity?

Limits multitasking, reduces context switching, clarifies priorities, enables faster cycle times.