Paano Kalkulahin si Kanban Board

Ano ang Kanban Board?

Tracks work in progress using visual columns (to-do, in-progress, done). Limits WIP to improve flow and reduce cycle time.

Step-by-Step na Gabay

  1. 1Set maximum WIP limit per column
  2. 2Move cards as work progresses
  3. 3Pull work from backlog when capacity available
  4. 4Identify bottlenecks where WIP exceeds limit
  5. 5Continuously improve based on metrics

Mga Nalutas na Halimbawa

Input
30 items, 10/col
Resulta
WIP limited

Mga Karaniwang Mali na Dapat Iwasan

  • Setting WIP limits too high defeating purpose
  • Not refreshing backlog priority regularly

Mga madalas itanong

What WIP limit should I use?

Start with team size × 2-3; adjust lower if blocking frequently, higher if flowing well.

How does Kanban improve productivity?

Limits multitasking, reduces context switching, clarifies priorities, enables faster cycle times.

Handa nang kalkulahin? Subukan ang libreng Kanban Board Calculator

Subukan ito sa iyong sarili →