Paano Kalkulahin si Reorder Point
Ano ang Reorder Point?
Calculates the inventory level at which to place a new order to avoid stockouts. Accounts for lead time and demand variability.
Pormula
Formula: reorder point = (D × LT) + SS
- D
- D value — Variable used in the calculation
- LT
- LT value — Variable used in the calculation
- SS
- SS value — Variable used in the calculation
Step-by-Step na Gabay
- 1Average daily demand (D)
- 2Lead time in days (LT)
- 3Safety stock (SS)
- 4Formula: reorder point = (D × LT) + SS
- 5Reorder when inventory reaches this level
Mga Nalutas na Halimbawa
Input
50/day use, 5day lead
Resulta
Order at 250
Mga Karaniwang Mali na Dapat Iwasan
- ✕Ignoring lead time variability
- ✕Not updating for seasonal demand changes
Mga madalas itanong
Why is reorder point important?
Prevents stockouts by triggering orders in advance, accounting for lead time.
How does lead time affect reorder point?
Longer lead times require higher reorder points and more safety stock.
Handa nang kalkulahin? Subukan ang libreng Reorder Point Calculator
Subukan ito sa iyong sarili →