Tracks work in progress using visual columns (to-do, in-progress, done). Limits WIP to improve flow and reduce cycle time.

Hướng dẫn từng bước

  1. 1Set maximum WIP limit per column
  2. 2Move cards as work progresses
  3. 3Pull work from backlog when capacity available
  4. 4Identify bottlenecks where WIP exceeds limit
  5. 5Continuously improve based on metrics

Ví dụ có lời giải

đầu vào
30 items, 10/col
Kết quả
WIP limited

Lỗi thường gặp cần tránh

  • Setting WIP limits too high defeating purpose
  • Not refreshing backlog priority regularly

Câu hỏi thường gặp

What WIP limit should I use?

Start with team size × 2-3; adjust lower if blocking frequently, higher if flowing well.

How does Kanban improve productivity?

Limits multitasking, reduces context switching, clarifies priorities, enables faster cycle times.