如何计算H V A C Load
learn.whatIsHeading
HVAC load calculation determines heating and cooling requirements. Proper sizing ensures comfort and efficiency without over/under-capacity.
公式
Total load = sensible + latent
分步指南
- 1Calculate sensible load: Q_s = U×A×ΔT (conduction) plus solar gains and internal loads
- 2Calculate latent load: Q_l = 0.68×CFM×Δh (moisture removal)
- 3Total load = sensible + latent
例题解析
输入
Office building 5000 m², design ΔT 8°C, occupancy 500 people
结果
Cooling load ≈ 250-300 kW depending on assumptions
Detailed calculation
常见错误注意事项
- ✕Under-sizing for future expansion or occupancy increases
- ✕Neglecting solar gains on west-facing windows
常见问题
What are typical cooling loads per area?
Office: 100-150 W/m², retail with solar: 200-300 W/m², industrial much higher.
How do people affect load?
Each person generates 100W sensible + 40W latent heat; occupancy density is major load driver.
准备好计算了吗?尝试免费的 H V A C Load 计算器
自己尝试一下 →