如何计算Kanban Board

learn.whatIsHeading

Tracks work in progress using visual columns (to-do, in-progress, done). Limits WIP to improve flow and reduce cycle time.

分步指南

  1. 1Set maximum WIP limit per column
  2. 2Move cards as work progresses
  3. 3Pull work from backlog when capacity available
  4. 4Identify bottlenecks where WIP exceeds limit
  5. 5Continuously improve based on metrics

例题解析

输入
30 items, 10/col
结果
WIP limited

常见错误注意事项

  • Setting WIP limits too high defeating purpose
  • Not refreshing backlog priority regularly

常见问题

What WIP limit should I use?

Start with team size × 2-3; adjust lower if blocking frequently, higher if flowing well.

How does Kanban improve productivity?

Limits multitasking, reduces context switching, clarifies priorities, enables faster cycle times.